KEEPING IT COOL ON THE JOB

April 25, 2016 / By Groupa Concrete

It’s that time of year again. T-shirts, summer dresses and shorts come out of long forgotten drawers in the dresser along with flip-flops and sandals. Dress codes change as do the winter days into spring. In some jobs such as construction work, certain safety measures need to be taken and some things like being in […]

A CASE OF CONCRETE EFFLORESCENCE

April 5, 2016 / By Groupa Concrete

You may or may not have noticed some white stains that will form over time on your stamped concrete and ask yourself where it comes from. While this could very well be a problem with the sealer, referred to as sealer diffusion, where the sealer lifts from the concrete, it could also be something else […]